ST.Activity.Setup Sites

Activity: Set-up Sites

Description

The Portfolio Administrator, a Site Coordinator or two, and others set up their respective sites and get them prepared for use. This activity should include setting up all the sites necessary for testing.

Role(s)

Portfolio Admin, Site Coordinator

Dependencies

ST.Activity.Test Preparation,ST.Activity.User and Site Preparation

Time required

(question)

Test Scripts

  • ST.Script.01.Set-up Portfolio Admin Site — The Portfolio Admin Site is used to manage global Forms, Glossaries, Layouts, Styles, Templates, etc. In this script, the portfolio program administrator logs in and configures the site. This involves setting up a global Glossary, Forms, Portfolio Templates, Layouts, Styles, and Reports. When completed, these global resources will be used in other sites in scripts that follow.
  • ST.Script.02.Set-up portfolio site — Instructor logs in and imports legacy matrix (exported from a 2.6 site) and legacy portfolio template, verifying that import is handled correctly.
  • ST.Script.03.Set-up course site — The instructor for a course site with portfolio tools logs in, and creates Forms, a Matrix, a Portfolio Template, Wizards, etc.from scratch.
  • ST.Script.04.Set-up project site — The project leader for a project site with portfolio tools logs in, and imports Forms, a Matrix, Wizards, a Portfolio Template, etc.
  • ST.Script.05.Add additional sites — This script is a freeform opportunity to create several of each type of site (portfolio, course, and project) with a tester-chosen selection of tools, permissions, and configuration.
  • ST.Script.06.Set-up and use the goal management tools
  • ST.Script.07.Set-up groups in project site — The project leader for a project site with portfolio tools logs in, configures the site with users, groups, and instructors, then exercises group filtering
  • ST.Script.08.Build Matrix in project site — The project leader for a project site with portfolio tools logs in and constructs a matrix from scratch.
  • ST.Script.09.Associate Course Site and Matrix — The project leader creates a course site with the Assignments tool, associates that site with an existing project site, and links matrix cells to individual assignments.