Lessons- Add link to an assignment (creating a new assignment in lessons)
GENERAL
TESTING
GENERAL
TESTING
Description
The buttons right above the due date calendar "prev" and "next" work, however they are not hyperlinked. they appear in black and they should be hyperlinked.
The calendar from the screenshot is no longer shown. Open/Due/Accept Until calendars open and function properly. Good to go.
Charles Hedrick April 10, 2016 at 2:08 PM
Please also verify that if you click on the calendar icon the calendar pops up and works.
Molly Kelsey April 10, 2016 at 9:44 AM
Edited
Just checked in MySql trunk - the calendar in the screenshot is no longer shown. does that mean this can be marked verified?
Charles Hedrick April 7, 2016 at 9:02 AM
This is another instance where jquery-ui.css needs to be loaded when jquery-ui.js is. I've fixed it in headscripts.js, which is where the load happens. It's easy to verify that the problem reported in this jira has been fixed. The question is whether it breaks any other tools. That would happen only if another tool uses a class that's defined by jquery-ui in a way the conflicts with this css. I think that's unlikely, but it's hard to test for.
If the 11 master chooses not to accept this patch for 11, I'll fix the one specific screen that causes this problem.
The buttons right above the due date calendar "prev" and "next" work, however they are not hyperlinked. they appear in black and they should be hyperlinked.