Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

 

DRAFT DRAFT DRAFT DRAFT DRAFT

 

Yes, this is a draft, actually it is a pre-draft working copy. Using Sakai 10 Schedule and Scope as a template to define a Sakai 11 Schedule and Scope.

Sakai 11 Strawman (possible features for Sakai 10)

Sakai 11 straw man


Proposed Scope

Sakai 11's time line will be driven by the Morpheus project. Morpheus includes removal of iframes in Sakai and the use of Responsive Design which optimizes the presentation of the Sakai GUI, making it easier to read and navigate across a wide range of devices with different size screens. Morpheus is expected to be mostly done by the end of January, with then additional QA testing and bug fixing needed. Marist has a demo version of Sakai using a (slightly outdated) version of Morpheus. 

Other major features from the Sakai 11 straw man (see link above) include the Dashboard, LEaP, and Gradebook (spreadsheet-like entry).

Blockers for Beta/RC

Sakai10 Schedule of Target Milestones

Milestone Targets

  • No labels