Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 23 Next »

Information

This documents the work being planned and done on the Sakai version of the Evaluation System.
Note: Any versions before 1.0 are development versions and should not be used in production

Project information

Milestones

  • Atlanta (Dec 4th, 2006)
    • Major Requirements
      • Create template
      • Assign evaluation
      • Take evaluation
      • View report
    • Tasks
  • 0.5 Public release (Jan 29th, 2007)
    • Major Requirements
      • Major functionality working (create, start, take, report)
      • Code re-organization (logic layer)
      • Some use of system settings
      • Initial administrative control
      • Finalize database structure
    • Tasks
    • SVN code location
  • 0.6 Feature release (Feb 12th, 2007)
    • Major Requirements
      • Code cleanup (evaluation bean, etc.)
      • Full use of system settings
      • Complete administrative control
      • Block type items
    • Tasks
    • SVN code location
  • 0.7 Communication release (Feb 26th, 2007)
    • Major Requirements
      • Instructor item replication
      • Scheduling functionality
      • Email functionality
    • Tasks
    • SVN code location
  • 0.8 External (March 12th, 2007)
    • Major Requirements
      • Expert templates and items
      • Selectable Items
      • External Contexts (Courses/Sites)
    • Tasks
    • SVN code location
  • 0.9 Instructor (March 26th, 2007)
    • Major Requirements
      • Instructor type items and reporting related to this
      • Scheduling and notification started
    • Tasks
    • SVN code location
  • 1.0 Production (May 21th, 2007)
    • Major Requirements
      • Scheduling and notification completed
      • Direct URLs to evaluations
      • Verify code works in Sakai 2.4
    • Tasks
    • SVN code location
  • 1.1 Pilot (June 4, 2007)
    • Major Requirements
      • Prep work for use in Sakai Amsterdam (group provider)
      • Code fixes for tester issues
      • Speed optimization (where needed)
    • Tasks
    • SVN code location
  • 1.2 Post Amsterdam (July 16, 2007)
  • 1.3 Hierarchy (March 26th, 2007)
    • Major Requirements
      • External Contexts (Courses/Sites)
      • Hierarchy administrative control
      • Multipart templates
      • Hierarchical templates
      • Hierarchical assignment
      • Hierarchical reporting
    • Tasks
    • SVN code location
  • No labels