Information
This documents the work being planned and done on the Sakai version of the Evaluation System.
Note: Any versions before 1.0 are development versions and should not be used in production
Project information
- Evaluation Design
- Evaluation Requirements
- JIRA tracking for Evaluation System
- SVN development code location
Milestones
- Atlanta (Dec 4th, 2006)
- Major Requirements
- Create template
- Assign evaluation
- Take evaluation
- View report
- Tasks
- Major Requirements
- 0.5 Public release (Jan 29th, 2007)
- Major Requirements
- Major functionality working (create, start, take, report)
- Code re-organization (logic layer)
- Some use of system settings
- Initial administrative control
- Finalize database structure
- Tasks
- SVN code location
- Major Requirements
- 0.6 Feature release (Feb 12th, 2007)
- Major Requirements
- Code cleanup (evaluation bean, etc.)
- Full use of system settings
- Complete administrative control
- Block type items
- Tasks
- SVN code location
- Major Requirements
- 0.7 Communication release (Feb 26th, 2007)
- Major Requirements
- Instructor item replication
- Scheduling functionality
- Email functionality
- Tasks
- SVN code location
- Major Requirements
- 0.8 External (March 12th, 2007)
- Major Requirements
- Expert templates and items
- Selectable Items
- External Contexts (Courses/Sites)
- Hierarchy administrative control
- Multipart templates
- Tasks
- SVN code location
- Major Requirements
- 0.9 Hierarchy (March 26th, 2007)
- Major Requirements
- Hierarchical templates
- Hierarchical assignment
- Hierarchical reporting
- External Contexts (Courses/Sites)
- Tasks
- SVN code location
- Major Requirements
- 1.0 Production (April 9th, 2007)
- Major Requirements
- Code cleanup
- Speed optimization
- Verify code work in Sakai 2.4
- Tasks
- SVN code location
- Major Requirements
- 1.1 PostPilot (???, 2007)
- Major Requirements
- Code fixes
- Speed optimization (where requested)
- Prep work for use in Sakai Amsterdam
- Tasks
- SVN code location
- Major Requirements