Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Discussion of the scope for the OSP 2.4 release. Consider that the release is planned for the April 2007 timeframe and the code freeze for the release is on March 15th. List items that you believe are important to include in the upcoming release. Ultimately the scope will be determined by the folks who commit to work on the 2.4 project, the resources available, and the time constraints. Also see the /wiki/spaces/REQ/pages/13648396425

Draft High Level Scope

Each of the items below represents a high-level scope item. These are intended to frame the release and focus our efforts on elaborating requirements that fall into scope, and postponing work on requirements that fall outside the scope. Once requirements are complete, the set of agreed upon requirements will be the detailed scope for the release.

UI rework/refinement. Focus on making the user experience more integrated and cohesive. This will involve assessing current user workflow's, reducing clicks, potentially reducing tools, increasing UI consistency between tools, language consistency, etc.

Documentation.

Sample data structures.

Reports.

Forward compatibility.

Integration with Goal Management Tool.

Increase ability to edit data structures once created.

Create "Builders" for the hard to create xsd, xsl, css, xhtml files.

  • No labels